www.kerryandjane.com Last updated: Sat 19 Jun 2010
Tiger: Build Diary

Cats
Chickens
Land Rover
Minis
Tiger
Spitfire
Striker
Photography
Other Stuff
Updates
 
Search


 All words
 Any word
 Phrase


 

April 2002
20th Painted the chassis (5.5 hrs) Details
25th Painted the bits I'd missed (0.5 hr) Details
28th Floor panels (4.5 hrs) Details
May 2002
6th Passenger footwell (4 hrs) Details
6th Pedal box (1 hr) Details
11th Driver's footwell (5.5 hrs) Details
September 2002
25th Master cylinder (1 hr) Details
29th Front-to-rear brake pipe (2.5 hrs) Details
30th Fuel pipe (1.5 hrs) Details
October 2002
6th Seat backs & wiring loom (4 hrs) Details
9th Handbrake and gear stick (2 hrs) Details
22nd Throttle pedal (1 hr) Details
22nd Tunnel sides (6.5 hrs) Details
November 2002
10th Brake proportioning valve (1.5 hrs) Details
16th Rear brake and fuel pipes (2 hrs) Details
17th Battery tray (2.5 hrs) Details
19th Rear subframe and diff (2 hrs) Details
January 2003
19th Hub nuts undone (2 hrs) Details
September 2003
14th Rear suspension (7 hrs) Details
26th Driveshafts and rear hubs (9 hrs) Details
April 2004
4th Front suspension (trial fit) (12.5 hrs) Details
9th Rolling chassis (1 hr) Details

Total time: 79 hours

 
News
Info
Build Diary
Costs
Parts


© 2001-2005
Kerry Buckley
and
Jane Murray
 


Hosted by
Dreamhost

Made on a Mac

Valid HTML 4.0

Valid RSS 1.0

RSS Feed